Skip Ribbon Commands
Skip to main content

Albert Einstein Charter ES

:

Albert Einstein AC ES WSM Phs 1B, CZ21-0777-24.A3.G2

Construction Services of the Whole Site Modernization Phase 1B (GMP No. 2) project.
   ​Albert Einstein Academies Charter ES                        PSA Specialist:
   3035 Ash Street, San Diego, CA 92101                      Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        04/10/24
        06/13/24                                                                           Bid award:   05/14/24
        07/31/24​
  
  
  
  
collapse Document Types : Bid Documents ‎(3)
Bid Ad_Albert Einstein ACES Phase 1B WSM (GMP2), CZ21-0777-24-A3-G2 (Erickson-Hall).pdf
  
5/31/2024 4:09 PMCruz Maria
Board Write-up_Final_Albert Einstein ACES  CZ21-0777-24-A3-G2.pdf
  
5/31/2024 4:10 PMCruz Maria
Sub List_Albert Einstein ACES Phase 1B WSM (GMP2), CZ21-0777-24-A3-G2.pdf
  
5/31/2024 4:19 PMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(50)
_GC Erickson Hall PJF (NSP).pdf
  
6/7/2024 5:30 PMCruz Maria
Ace Electric LOA (DUS).pdf
  
6/7/2024 5:30 PMCruz Maria
Ace Electric SPJ.pdf
  
6/12/2024 2:13 PMCruz Maria
Ace tier AEC LOA.pdf
  
7/19/2024 4:38 PMCruz Maria
Ace tier AEC SPJ.pdf
  
7/19/2024 4:38 PMCruz Maria
Ace tier Badger Daylighting LOA (DUS).pdf
  
6/13/2024 10:17 AMCruz Maria
Ace tier Standard Electric LOA (DUS).pdf
  
6/13/2024 8:56 AMCruz Maria
Ace tier Standard Electric SPJ.pdf
  
6/13/2024 8:52 AMCruz Maria
Ace tier World Bridge Tech LOA (DUS).pdf
  
6/12/2024 3:13 PMCruz Maria
Ace tier World Bridge Tech SPJ.pdf
  
6/12/2024 3:17 PMCruz Maria
Bayview Environmental Srvs LOA (DUS)(rev).pdf
  
6/13/2024 10:18 AMCruz Maria
Bayview Environmental Srvs LOA (DUS).pdf
  
6/7/2024 5:31 PMCruz Maria
Bayview Environmental Srvs SPJ (rev -tier).pdf
  
7/15/2024 2:22 PMCruz Maria
Bayview Environmental Srvs SPJ.pdf
  
6/10/2024 7:03 PMCruz Maria
Bayview Envrnmntl tier Demo Masters LOA (DUS).pdf
  
6/13/2024 1:09 PMCruz Maria
Bayview Envrnmntl tier Demo Masters SPJ.pdf
  
6/13/2024 1:10 PMCruz Maria
Bayview tier CA Tree SPJ.pdf
  
10/1/2024 5:17 PMCruz Maria
Bayview tier Fastrack Rentals LOA.pdf
  
7/15/2024 2:28 PMCruz Maria
Bayview tier GPRS LOA.pdf
  
7/15/2024 2:32 PMCruz Maria
Bayview tier GPRS SPJ.pdf
  
7/15/2024 3:17 PMCruz Maria
C Below LOA (DUS).pdf
  
6/7/2024 5:32 PMCruz Maria
Costa Azul Contracting Grp LOA (DUS).pdf
  
6/7/2024 5:32 PMCruz Maria
D 3 Construction LOA (DUS).pdf
  
6/7/2024 5:40 PMCruz Maria
D 3 Construction SPJ.pdf
  
6/7/2024 5:32 PMCruz Maria
Hamel Concrete SPJ (rev1 -add tier).pdf
  
6/13/2024 9:15 AMCruz Maria
Hamel Concrete SPJ (rev2 -add tier Noland).pdf
  
10/2/2024 9:30 AMCruz Maria
Hamel Concrete SPJ.pdf
  
6/10/2024 7:12 PMCruz Maria
Hamel tier CTR Concrete Pumping LOA.pdf
  
10/1/2024 5:50 PMCruz Maria
Hamel tier CTR Concrete Pumping SPJ.pdf
  
10/1/2024 5:55 PMCruz Maria
Hamel tier Cut N Core LOA (DUS).pdf
  
7/19/2024 4:48 PMCruz Maria
Hamel tier Cut N Core SPJ.pdf
  
7/19/2024 4:48 PMCruz Maria
Hamel tier Nolan Excavation LOA.pdf
  
10/9/2024 2:51 PMCruz Maria
Hamel tier Nolan Excavation SPJ.pdf
  
10/9/2024 2:52 PMCruz Maria
Hamel tier Quality Rebar LOA (DUS).pdf
  
6/12/2024 1:46 PMCruz Maria
Hamel tier Quality Rebar SPJ.pdf
  
6/7/2024 5:33 PMCruz Maria
J and B Survey LOA (DUS).pdf
  
6/7/2024 5:33 PMCruz Maria
J and B Survey SPJ.pdf
  
6/7/2024 5:34 PMCruz Maria
MDB Gnrl Engr LOA (DUS).pdf
  
6/7/2024 5:34 PMCruz Maria
MDB Gnrl Engr SPJ.pdf
  
6/7/2024 5:34 PMCruz Maria
MEK LOA (DUS).pdf
  
6/7/2024 5:35 PMCruz Maria
MEK SPJ.pdf
  
6/12/2024 4:56 PMCruz Maria
Pacific Coast Iron LOA (DUS).pdf
  
6/7/2024 5:35 PMCruz Maria
Pacific Coast Iron SPJ (NSP)(rev-tier).pdf
  
7/15/2024 3:51 PMCruz Maria
Pacific Coast tier Anning Johnson SPJ.pdf
  
7/30/2024 3:16 PMCruz Maria
Ranbar Plumbing LOA (DUS).pdf
  
6/7/2024 5:35 PMCruz Maria
Ranbar Plumbing SPJ  (rev -sow LU89).pdf
  
7/30/2024 3:22 PMCruz Maria
Ranbar Plumbing SPJ.pdf
  
6/12/2024 2:22 PMCruz Maria
Ranbar tier Karcher Insulation LOA.pdf
  
7/15/2024 3:55 PMCruz Maria
T.L. Shields and Associates LOA.pdf
  
10/1/2024 5:23 PMCruz Maria
T.L. Shields and Associates SPJ.pdf
  
10/1/2024 5:49 PMCruz Maria
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(8)
20240613 PJM 1_Albert Einstein ACES WSM -Phase 1B (GMP2) _Chat.pdf
  
8/14/2024 2:21 PMCruz Maria
20240613 PJM 1_Albert Einstein ACES WSM -Phase 1B (GMP2) -Attendance Report.pdf
  
8/14/2024 2:17 PMCruz Maria
20240613 PJM 1_Albert Einstein ACES WSM -Phase 1B (GMP2) -Meeting Minutes.pdf
  
8/14/2024 2:18 PMCruz Maria
20240613 PJM 1_Albert Einstein ACES WSM -Phase 1B (GMP2) -Recording.mp4
  
8/14/2024 2:21 PMCruz Maria
20240731 PJM 2_Albert Einstein ACES WSM -Phase 1B (GMP2) _ Attendance.pdf
  
8/14/2024 2:22 PMCruz Maria
20240731 PJM 2_Albert Einstein ACES WSM -Phase 1B (GMP2) _Chat.pdf
  
8/14/2024 2:24 PMCruz Maria
20240731 PJM 2_Albert Einstein ACES WSM -Phase 1B (GMP2) _Meeting Minutes.pdf
  
8/14/2024 2:29 PMCruz Maria
20240731 PJM 2_Albert Einstein ACES WSM -Phase 1B (GMP2) _Recording.mp4
  
8/14/2024 2:22 PMCruz Maria